MCFP were contacted by an Architect that had been present at an Automist CPD presentation carried out by Liam Hughes one of MCFP Automist design team. The architect had ran into a problem with an alternative system failing during the commissioning process. The building works had all been completed and we were tasked with installing the Plumis Hydra system to replace the Puck system previously installed. MCFP installation team were excited with the challenge as it was the first installation using the multi-head system. The installation and commissioning were carried successfully and the client was happy as we were able to carry out the installation without causing any further damage to the property.